Fig. 3

Simulated track (green full line) and estimated YAPS track (red dashed line) for the three shifts out-of-array (columns) and for mean burst intervals 1.2, 30 and 90 s (rows), with rbi (random burst interval; a); and known rbi (known random burst interval; b). The black dots represent the receivers